Request an EstimateGet estimate

PLANNING BEFORE FIELD WORK

Temporary Traffic Control Plans.

Site-specific traffic control planning for construction, utility work, and projects affecting streets, sidewalks, and public access.

THE PUBLIC READY APPROACH

Make space for the work. Keep public access in the picture.

  • 11 × 17 and 24 × 36 plan formats, as appropriate to the project
  • Location, work footprint, schedule, equipment, and access considered together
  • Engineering review coordinated when required by the reviewing agency
Request an Estimate
Public Ready lane shift traffic control plan example at Abbot Kinney Boulevard and Venice Boulevard
Past project example. Approval applies only to the project shown and does not represent agency endorsement. View full size ↗

A quicker way to understand

What Is Temporary Traffic Control?

How temporary planning helps communicate changes to traffic, pedestrian routes, and public access during work.

Read the video guide

DRAFTED BY PUBLIC READY

Explore example traffic control plans.

See phased traffic control, sidewalk closure, utility operations, and road closure examples from four Southern California cities.

Browse example plans

Support for your scope.

Planning a California project? Explore temporary traffic control requirements in California →

Start with what you have.

Bring your address, work description, site plan or photographs, equipment dimensions, and proposed dates.

Tell us about your project

General work-zone traffic-control labor, flagging, cone or barricade deployment, maintenance, and removal are performed by separate execution providers. Public Ready supplies and posts Temporary No Parking signs when required, including when the governing city or agency does not post them. Public Ready removes only the signs Public Ready posted. Posting follows applicable agency requirements and the agreed project scope. Final approvals and processing times remain with the governing agency.

NEXT STEPS FOR YOUR PROJECT

A CLEARER STARTING POINT

What does a traffic control plan communicate?

A traffic control plan describes how the work footprint and movement of vehicles, pedestrians, and bicycles fit together during a temporary activity. It may show signs and devices, lane restrictions, pedestrian routing, access, and phases. A drawing is not itself a permit or proof of agency approval.

Construction, utility work, deliveries, and equipment operations can change normal public access. The location, work conditions, and reviewing agency determine the planning and review needed.

How Public Ready helps

Public Ready prepares site-specific planning documents and coordinates review comments and engineering review when required within the agreed scope.

Explore traffic control plan services · Request a project estimate

Optional deeper reading from Public Ready’s educational resources:

Read the traffic control plan guide on WorkZoneCompliance (opens in a new tab)

Explore temporary traffic control sign references (opens in a new tab)

Educational resources developed by Public Ready. Confirm requirements with the responsible agency for your project.

Browse all project scenarios → · Find location guidance →

LET’S GET YOUR PROJECT READY

Before the first cone.
Start with Public Ready.

Request an Estimate Prefer to talk? (323) 900-9824